SCJ provided a predesign report for the existing condition of the electrical, potable water, and irrigation systems at the Lakeshore RV Park, a 200-site, City owned campground on the shores of Lake Chelan. SCJ identified upgrade options and any inadequacies in the existing system and provided cost estimates for improvement options.
SCJ’s recommendations included upgrades to the electrical system to increase the size of campsite electrical services, a complete replacement of the existing irrigation system, development of a new source for irrigation water, and potable water system upgrades. The team completed design of the upgrades, prepared a full PS&E document, public bidding, and award of the project. Construction engineering services were also provided for the improvements.