SCJ led the design and contract development for the Denny Creek Parking Expansion, aiming to enhance access to the popular Denny Creek Trail. The project included designing approximately 1,000 feet of roadway, two parking areas, 500 feet of connecting trails, and drainage systems. Additional amenities such as a vault toilet, information kiosk, and shelters were incorporated to improve the user experience. To minimize environmental impact, pervious pavement was utilized, and three culverts with connecting ditches were installed to manage stormwater runoff. SCJ also prepared a comprehensive drainage report to ensure compliance with all stormwater core requirements.