LOCATION
Bonney Lake, WA

CLIENT(S)
City of Bonney Lake

INVOLVEMENT
2012-2013

SR 410/Main Street/Sky Island Drive intersection is a major intersection constrained by geographic and built-environment challenges. Anticipating continuing development, the city pursued an ultimate intersection configuration instead of waiting for the varying temporary fixes they could implement through SEPA traffic mitigation. Preliminary engineering was provided to define the scope of intersection improvements and gain WSDOT approval. However, because funds were limited, the city decided to defer the improvements.

Then a developer proposed a new medical office building at the intersection that generated mitigation fees sufficient to construct the ultimate intersection design. Suddenly there was great urgency to get the project to construction. Fast-tracked final design was completed, including pavement inlays and widening, sidewalks and access ramps, a traffic signal, stormwater and Schedule 74 utility undergrounding. In addition to all the design work, SCJ also took care of cost estimation and WSDOT coordination.

CLIENT TESTIMONIAL

“I love SCJ’s honesty and knowing they would do the right thing even if nobody’s looking. The character of the company — it’s what makes the difference.”

John Woodcock, PE
City Engineer
City of Bonney Lake

STAFF STORY

“It was exciting to be able to offer Bonney Lake design solutions that exceeded their expectations for traffic capacity, yet still met their timeline and budget.”

Scott Sawyer, PE
Project Manager
SCJ Alliance